COLLIE DESCENT

COURSE DETAILS (THIS PAGE UNDER CONSTRUCTION)

 

START at Harris River Winery (Just below where the East Branch of the Collie River is joined by the Harris River)

  Tea trees and pools

  Pipe line  5.5 km (5.5)

  Tea trees and pools

  Some small rapids

  Ewington Bridge  8.5 km (3)

  Ewington Weir  8.75 km (0.25)

  FLAT WATER FROM HERE TO ROBBOS ROCK WEIR

  Swing Bridge  10.35 km (1.6)

  Co-op Bridge (Center of town)  10.9 km (0.55)

  East End railway bridge  11.55 km (0.65)

  East End Bridge  11.8 km (0.25)

  Railway bridge  12.1 km (0.3)

  East End Weir (Compulsory portage to right side of river)  13.3 km (1.2)

  Preston Rd Bridge  14.1 km (0.8)

  Minningup Pool  17.6 km (3.5)

  Griffin Bridge (Mungalup Rd Bridge)  19.1 km (1.5)

  Skeleton Bridge  19.4 km (0.3)

  Robbos Rock Weir (Compulsory portage to right side of river)  20.1 km (0.7)

  Small rapids and pools

  PWD metering station (Big rapid, portage to right if in doubt or low water)  22.65 km (2.55)

  More small rapids and pools (Watch out for logs and tree roots when water level is low at Wellington Dam.

  Power line  24.8 km (2.15)

  Rocky Crossing (Small rapid)  25.3 (0.5)

  Flat water from here on.

  Finish Black Diamond Bridge (Uncrossable, flood damaged)  27.1 km (1.8)

Back to 2005 COLLIE DESCENT main page.

Back to Hyperactive sports main page.